Lehigh University
Art Architecture and Design
113 Research Drive
Building C
Bethlehem, PA 18015

Selinee

Week 2: Congregation Progress, Part 2

I spent most of the time finishing up the model as much as I could using the new cross section I found. That was my first priority so that once I get to the drawings I don’t have to change anything. I spent a long time just trying to figure out what the easiest way to do the seats would be so it was a bit of a struggle. For the most part, Yankee Stadium is done (just need to add windows and door gates, and the benches) and just need to add the parking garage and the streets and crosswalks nearby.

Leave a Reply